I am a technically sophisticated and highly dynamic Electrical Engineer with extensive experience in electrical engineering, project management, operations and maintenance, commissioning, integration, troubleshooting, and dismantling of technical and highly valued equipment. Proven success in maintaining and modifying existing equipment and systems. Adept at directing multiple project-based efforts as well as leading and motivating cross-functional teams. Maintenance of Complete L.T Room, Lift system, 11KVA, Escalators, Electrical Staff. HT trolley, HVAC, and Generator’s. Conversant with creating and executing engineering processes to increase productivity and controls through process improvement. Proficiently function in a challenging environment requiring, presentation, problem solving, critical and analytical thinking abilities. Create and review calculations and collaborate with engineering staff. Consistent record of developing project schedules, estimating costs, monitoring work progress, and strategizing project requirements.
My key skills include Electrical Engineering, Installation & Commissioning, Project Management, Risk Assessment & Mitigation, Strategic Planning & Analysis, Continues Process Improvement, Electrical Test Equipment, Operation & Maintenance, Documentation, Troubleshooting, Problem Solving and Communication Skills
My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such, I would welcome a discussion regarding opportunities with your organization that fit my background.
Hold accountable for the complete safety management procedure, installation of plant new 270 tone ASU at Port Qasim Karachi plant.
Acquire fundamental engineering knowledge and technical expertise includes electrical engineering; communications systems, testing; installation, fault finding and diagnosis.
Participate in various projects handling a broad scope of functions. Hold direct accountability for preparing engineering designs, documentation preparation, and hands-on project activities.
Key Project:
Completed installation, erection, testing, Commissioning of New Plant , Monitor the complete electrical installation of HT Trolley, and Distribution of 11KVA, Design and installing of L.V, Load management of the projects, Energizing the transformer with testing the earth of transformer, Management of Electrical Staff, designing of L.T Room with cables, panels and M.C.C.B, for new plant.
Held accountable for the maintenance of electrical, mechanical, civil and plumbing positioning of all the companies in the group.
Maintained a safe and healthy work environment by implementing, maintaining and aligning company policies that adhere to health and safety regulations.
Implemented regularly scheduled testing, maintenance, and preventative maintenance of electrical.
Key Project:
Completed is mantling & installation, erection, testing, Commissioning of New escalators. Monitor the complete Maintenance of Lift system, Escalators, HT Trolley, and Distribution of 11KVA, Design and installing of HVAC System, Load management of the projects, Energizing the transformer with testing the earth of transformer, Management of Electrical Staff, Installation and Dismantling the Escalators and Maintenance of escalator, Complete Redesigning of L.T Room with cables, panels and M.C.C.B, Semi Synchronizations of Generators all Maintenance work is done my supervision and directions.
Pace Shopping Mall Gulberg Lahore
Pace M.M Alam Road Lahore
Pace Link Road Model Town Lahore
Pace Head Office fortress Lahore
Attended the skills improvement & training programs of following vendors.
SIEMENS (Switch Gears)
Installation, commissioning & operation of 0.4KV, 3.3KV switch gears.
Sequence test of modules through field and control room.
Preventive maintenance of 0.4KV & 3.3 KV switchgear & MCC’s.
Motors
Installation, Commissioning & operation of 0.4KV, 3.3KVmotors.
Solo runs test of motors (No Load).
Vibration test of motors.
Mechanical run test of Motors (on Load).
Preventive maintenance of motors.
FUJI ELECTRIC (Control & Protections)
Wiring of an Access control system, wiring of DOL.
Study of control circuits through drawings.
Safety Training Programs:
Attended safety training programs in PAK-ARAB REFINERY LIMITED & DESCON
First Aid
Work Permit Systems
Plant and Human Safety
Use of Personnel Protective Equipment (PPE’s)
Electrical Panels:
Exercised hands-approach to install, commission, operation and maintenance of low voltage and high voltage panels installed. Skills to provide emergency and temporary power supply panels.
Transformers:
Installation, inspection, testing, commissioning and maintenance of all types of transformers.
Field Test:
Hi-Pot Test of cables with Panels
Insulation resistance test of Motors, Cables, Panels & transformers
Di-electric strength test of transformer oil
Grounding Resistance test of grounding network
Cold loop test Motors, Cables, Panels
Held accountable for the maintenance of electrical, mechanical, civil and plumbing positioning of all the companies in the group.
Key Project:
Completed is mantling & installation, erection, testing, commissioning of new escalators.
Supervised the complete Maintenance of Lift system, Escalators, HT Trolley, and Distribution of 11KVA, Design and installing of HVAC System, Load management of the projects, Energizing the transformer with testing the earth of transformer, Management of Electrical Staff, Installation And Dismantling the Escalators and Maintenance of escalator, Complete Redesigning of L.T Room with cables, panels and M.C.C.B, Semi Synchronizations of Generators all Maintenance work is done my supervision and directions.
Pace Shopping Mall Gulberg Lahore
Pace M.M Alam Road Lahore
Pace Link Road Model Town Lahore
Pace Head Office fortress Lahore
Instrumental in maintenance, troubleshooting and installation of machines.
Oversaw preparation of project documents, project schedules & ensure compliance to all health and safety policies.